Whitehall Elected Officials and Staff conducted an onsite walk-through on September 21, 2022 prior to the Borough Council Meeting.
Aqua Pool, the Pool Consultant has been mobilized. The pool basin’s slab stone has been placed and the
installation of the formwork for the concrete pool perimeter walls is complete. The main pool drain was
installed, and concrete is slated to be poured in the coming weeks.
General Contractor, Nello Construction poured the final section of the retaining wall along the back of the deep end of the pool.
Additionally, exterior walls and roofing were completed for the concession stand, ticket both and pump room buildings.